Hess asked Intetech to investigate gas-injection-well production-casing materials selection for its Ujung Pangkah project, Indonesia. Production and injection scenarios for different phases during the project’s life were considered, and the company was advised on the relative benefits of using corrosion-resistant alloy tubing and conventional steels, with and without inhibition. We found a cost-effective solution that was appropriate for all stages of the project life.

“It is a pleasure to work with people who do a good job. I will be recommending Intetech, not only for corrosion engineering but also for well integrity work.”

Senior drilling engineer